Barry County

No traffic impacts

 

Barton County

US 160 – BARTON COUNTY – Expect Delays

MOWING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins .25 MILES AFTER IS 49 S.
Work will be done around the clock, on weekdays only.

State Route 43- BARTON COUNTY – Expect Delays

PATCHING DRIVE SURFACE
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins 2.01 MILES AFTER MO 126 W.
Work will be done around the clock, on weekdays only.

State Route 43 – BARTON COUNTY – Expect Delays

MOWING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins .02 MILES AFTER RT K E.
Work will be done around the clock, on weekdays only.

State Route F – BARTON COUNTY – Expect Delays

PAVEMENT REPAIR
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins AT RT C E.
Work will be done around the clock, on weekdays only.

State Route HH- BARTON COUNTY – Expect Delays

PAVEMENT REPAIR
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins AT US 160 E.
Work will be done around the clock, on weekdays only.

State Route K – BARTON COUNTY – Expect Delays

PATCHING DRIVE SURFACE
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins AT MO 43 S.
Work will be done around the clock, on weekdays only.

State Route M – BARTON COUNTY – Expect Delays

MOWING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins .11 MILES AFTER US 160 W.
Work will be done around the clock, on weekdays only.

State Route NN – BARTON COUNTY – Expect Delays

PATCHING DRIVE SURFACE
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins AT RT K E.
Work will be done around the clock, on weekdays only.

State Route NN – BARTON COUNTY – Expect Delays

MOWING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins .21 MILES AFTER CRD NW 40TH RD E.
Work will be done around the clock, on weekdays only.

State Route T – BARTON COUNTY – Expect Delays

PAVEMENT REPAIR
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins AT US 160 E.
Work will be done around the clock, on weekdays only.

State Route U – BARTON COUNTY – Expect Delays

PAVEMENT REPAIR
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins .49 MILES BEFORE RT T S.
Work will be done around the clock, on weekdays only.

 

 

Bates County 

State Route FF North – BATES COUNTY – CLOSED

PATCHING DRIVE SURFACE
Scheduled from 12-OCT-2017 to 12-OCT-2017.
Road work begins .05 MILES AFTER RT F W.
Work will be done around the clock, on weekdays only.

Interstate 49  – BATES COUNTY – Expect Delays

BRIDGE MAINTENANCE
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins .07 MILES BEFORE RT D E.
Work will be done around the clock, on weekdays only.

State Route B – BATES COUNTY – Expect Delays

MOWING
Scheduled from 11-OCT-2017 to 26-OCT-2017.
Road work begins LESS THAN .01 MILES AFTER IS 49 S.
Work will be done around the clock, on weekdays only.

State Route M – BATES COUNTY – Expect Delays

MOWING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins .22 MILES AFTER RT B W.
Work will be done around the clock, on weekdays only.

State Route WW – BATES COUNTY – Expect Delays

MOWING
Scheduled from 11-OCT-2017 to 19-OCT-2017.
Road work begins AT RT A W.
Work will be done around the clock, on weekdays only.

 

Benton County

State Route 7 – BENTON COUNTY – Expect Delays

BRIDGE RECONSTRUCTION
Scheduled from 04-AUG-2017 to 20-OCT-2017.
Road work begins 1.35 MILES AFTER US 65 S.
Work will be done around the clock, 7 days a week.

 

Cedar County

No traffic impacts

 

Christian County

US 65 – CHRISTIAN COUNTY – Expect Delays

BRIDGE RECONSTRUCTION
Scheduled from 05-MAY-2017 to 01-NOV-2017.
Road work begins .63 MILES BEFORE CRD EVANS RD W.
Work will be done around the clock, on weekdays only.

State Route 14 – CHRISTIAN COUNTY – Expect Delays

SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-SEP-2017 to 27-OCT-2017.
Road work begins .25 MILES BEFORE MO 125 S.
Work will be done around the clock, on weekdays only.

State Route CC – CHRISTIAN COUNTY – Expect Delays

SHOULDER WORK
Scheduled from 27-JUL-2017 to 31-OCT-2017.
Road work begins LESS THAN .01 MILES AFTER RT CC W.
Work will be done around the clock, 7 days a week.

State Route PP – CHRISTIAN COUNTY – Expect Delays

SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-SEP-2017 to 27-OCT-2017.
Road work begins LESS THAN .01 MILES AFTER MO 14 W.
Work will be done around the clock, on weekdays only.

 

Dade County

State Route 97 – DADE COUNTY – Expect Delays

PAVEMENT REPAIR
Scheduled from 11-OCT-2017 to 12-OCT-2017.
Road work begins .14 MILES BEFORE CST FOURTH ST E.
Work will be done around the clock, on weekdays only.

 

 

Dallas County

State Route B – DALLAS COUNTY – Expect Delays

RESURFACING PAVEMENT
Scheduled from 18-SEP-2017 to 12-OCT-2017.
Road work begins AT RT M E.
Work will be done around the clock, on weekdays only.

State Route M – DALLAS COUNTY – Expect Delays

RESURFACING PAVEMENT
Scheduled from 18-SEP-2017 to 12-OCT-2017.
Road work begins AT RT B S.
Work will be done around the clock, on weekdays only.

 

Greene County

Interstate 44 – GREENE COUNTY – Expect Delays

PAVEMENT REPAIR
Scheduled from 05-SEP-2017 to 01-NOV-2017.
Road work begins .02 MILES AFTER CST GLENSTONE AVE S.
Work will be done around the clock, on weekdays only.

Interstate 44 – GREENE COUNTY – Expect Delays

RESURFACING PAVEMENT
Scheduled from 30-MAY-2017 to 01-NOV-2017.
Road work begins .02 MILES AFTER MO 125 N.
Work will be done around the clock, on weekdays and Saturdays.

US 160 – GREENE COUNTY – Expect Delays

PAVEMENT REPAIR
Scheduled from 11-OCT-2017 to 12-OCT-2017.
Road work begins 1.29 MILES AFTER CST HUNT RD S.
Work will be done around the clock, on weekdays only.

US 60 – GREENE COUNTY – Expect Delays

NEW PAVEMENT CONSTRUCTION
Scheduled from 24-JUL-2017 to 15-DEC-2017.
Road work begins .02 MILES AFTER RT FF N.
Work will be done around the clock, 7 days a week.

US 65  – GREENE COUNTY – Expect Delays

BRIDGE RECONSTRUCTION
Scheduled from 05-MAY-2017 to 01-NOV-2017.
Road work begins .1 MILES BEFORE BU 65 N.
Work will be done around the clock, on weekdays only.

Business 65 – GREENE COUNTY – Expect Delays

NEW PAVEMENT CONSTRUCTION
Scheduled from 19-JAN-2017 to 01-DEC-2017.
Road work begins .24 MILES BEFORE CST CHESTNUT EXPY W.
Work will be done around the clock, 7 days a week.

CHESTNUT EXPY – GREENE COUNTY – Expect Delays

MILLING/RESURFACING WORK
Scheduled from 01-OCT-2017 to 01-NOV-2017.
Road work begins LESS THAN .01 MILES AFTER BU 65 S.
Work will be done around the clock, 7 days a week.

State Route F  – GREENE COUNTY – Expect Delays

PATCHING DRIVE SURFACE
Scheduled from 11-OCT-2017 to 12-OCT-2017.
Road work begins .7 MILES BEFORE RT T E.
Work will be done around the clock, on weekdays only.

 

Henry County

State Route 13 – HENRY COUNTY – Expect Delays

BRIDGE MAINTENANCE
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins .74 MILES AFTER MO 52 E.
Work will be done around the clock, on weekdays only.

State Route 18 – HENRY COUNTY – Expect Delays

SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-AUG-2017 to 13-OCT-2017.
Road work begins LESS THAN .01 MILES AFTER CST SECOND ST S.
Work will be done around the clock, on weekdays only.

State Route 13 – HENRY COUNTY – Delays Possible

BRIDGE RECONSTRUCTION
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins 3.23 MILES BEFORE MO 52 W.
Work will be done around the clock, on weekdays only.

State Route 23  – HENRY COUNTY – Delays Possible

LIGHTING/SIGNAL/SIGN WORK
Scheduled from 09-OCT-2017 to 27-OCT-2017.
Road work begins .39 MILES AFTER MO 2 E.
Work will be done around the clock, on weekdays only.

 

Hickory County

No traffic impacts

 

Jasper County

State Route 171  – JASPER COUNTY – Expect Delays

BRIDGE RECONSTRUCTION
Scheduled from 31-MAY-2017 to 01-NOV-2017.
Road work begins .16 MILES AFTER MO 43 S.
Work will be done around the clock, 7 days a week.

State Route 37  – JASPER COUNTY – Expect Delays

SIDEWALK/ADA IMPROVEMENTS
Scheduled from 18-SEP-2017 to 30-OCT-2017.
Road work begins .25 MILES BEFORE CST HIGH ST W.
Work will be done around the clock, on weekdays only.

State Route 37 – JASPER COUNTY – Expect Delays

MOWING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins .32 MILES AFTER MO 96 W.
Work will be done around the clock, on weekdays only.

State Route 43 – JASPER COUNTY – Expect Delays

MOWING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins .11 MILES AFTER RT H E.
Work will be done around the clock, on weekdays only.

Outer Road 49 – JASPER COUNTY – Expect Delays

MOWING
Scheduled from 02-OCT-2017 to 12-OCT-2017.
Road work begins .
Work will be done around the clock, on weekdays only.

State Route C – JASPER COUNTY – Expect Delays

MOWING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins .08 MILES AFTER MO 37 N.
Work will be done around the clock, on weekdays only.

State Route D – JASPER COUNTY – Expect Delays

MOWING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins 1.4 MILES AFTER RT V W.
Work will be done around the clock, on weekdays only.

State Route H – JASPER COUNTY – Expect Delays

MOWING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins AT MO 43 S.
Work will be done around the clock, on weekdays only.

State Route M  – JASPER COUNTY – Expect Delays

MOWING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins LESS THAN .01 MILES AFTER RT N E.
Work will be done around the clock, on weekdays only.

State Route O  – JASPER COUNTY – Expect Delays

MOWING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins .05 MILES AFTER MO 96 W.
Work will be done around the clock, on weekdays only.

State Route T  – JASPER COUNTY – Expect Delays

PAVEMENT REPAIR
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins AT RT K W.
Work will be done around the clock, on weekdays only.

 

 

Lawrence County 

Business 60 – LAWRENCE COUNTY – Road Closed

BRIDGE RECONSTRUCTION
Road closure begins 1.31 MILES BEFORE US 60 W.
Scheduled from 17-JUL-2017 to 29-DEC-2017.

State Route 96 – LAWRENCE COUNTY – Road Closed

BRIDGE RECONSTRUCTION
Road closure begins 2.46 MILES AFTER MO 97 S.
Scheduled from 14-AUG-2017 to 01-NOV-2017.

Interstate 44  – LAWRENCE COUNTY – Expect Delays

BRIDGE MAINTENANCE
Scheduled from 09-OCT-2017 to 12-OCT-2017.
Road work begins .05 MILES BEFORE MO 96 E.
Work will be done around the clock, on weekdays only.

Interstate 44 – LAWRENCE COUNTY – Expect Delays

PAVEMENT REPAIR
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins 1.25 MILES AFTER MO 97 S.
Work will be done around the clock, on weekdays only.

Interstate 44 – LAWRENCE COUNTY – Expect Delays

UNDERSEALING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins .49 MILES BEFORE MO 265 S.
Work will be done around the clock, on weekdays only.

State Route C – LAWRENCE COUNTY – Expect Delays

MOWING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins .03 MILES AFTER RT AA S.
Work will be done around the clock, on weekdays only.

State Route F – LAWRENCE COUNTY – Expect Delays

CHIP SEAL OVERLAY
Scheduled from 09-OCT-2017 to 12-OCT-2017.
Road work begins 2.23 MILES BEFORE IS 44 W.
Work will be done around the clock, on weekdays only.

State Route V  – LAWRENCE COUNTY – Expect Delays

CHIP SEAL OVERLAY
Scheduled from 09-OCT-2017 to 12-OCT-2017.
Road work begins LESS THAN .01 MILES BEFORE CRD 2110 E.
Work will be done around the clock, on weekdays only.

State Route YY – LAWRENCE COUNTY – Expect Delays

CHIP SEAL OVERLAY
Scheduled from 09-OCT-2017 to 12-OCT-2017.
Road work begins 1.97 MILES AFTER MO 96 W.
Work will be done around the clock, on weekdays only.

 

McDonald County

Business 71 – MCDONALD COUNTY – Expect Delays

ROADSIDE WORK
Scheduled from 11-SEP-2017 to 03-NOV-2017.
Road work begins 2.29 MILES AFTER IS 49 S.
Work will be done around the clock, on weekdays only.

State Route 43 – MCDONALD COUNTY – Expect Delays

SHOULDER WORK
Scheduled from 11-SEP-2017 to 03-NOV-2017.
Road work begins 1.67 MILES AFTER MO 76 W.
Work will be done around the clock, on weekdays only.

 

Newton County

No traffic impacts

 

Polk County

State Route EE – POLK COUNTY – Expect Delays

PATCHING DRIVE SURFACE
Scheduled from 18-SEP-2017 to 12-OCT-2017.
Road work begins AT RT H N.
Work will be done around the clock, on weekdays only.

State Route FF  – POLK COUNTY – Expect Delays

PATCHING DRIVE SURFACE
Scheduled from 18-SEP-2017 to 12-OCT-2017.
Road work begins AT RT EE W.
Work will be done around the clock, on weekdays only.

 

St. Clair County

State Route 13 – ST. CLAIR COUNTY – Expect Delays

BRIDGE MAINTENANCE
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins 1.68 MILES AFTER MO 82 W.
Work will be done around the clock, on weekdays only.

State Route 82 East – ST. CLAIR COUNTY – Expect Delays

BRIDGE MAINTENANCE
Scheduled from 25-SEP-2017 to 12-OCT-2017.
Road work begins .51 MILES AFTER MO 13 N.
Work will be done around the clock, on weekdays only.

Ramp US54 TO MO13N North – ST. CLAIR COUNTY – Expect Delays

BRIDGE MAINTENANCE
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins AT US 54 W.
Work will be done around the clock, on weekdays only.

State Route B – ST. CLAIR COUNTY – Expect Delays

MOWING
Scheduled from 11-OCT-2017 to 26-OCT-2017.
Road work begins .09 MILES BEFORE RT H S.
Work will be done around the clock, on weekdays only.

State Route C – ST. CLAIR COUNTY – Expect Delays

BRIDGE MAINTENANCE
Scheduled from 11-OCT-2017 to 12-OCT-2017.
Road work begins 3.41 MILES AFTER RT A W.
Work will be done around the clock, on weekdays only.

State Route D – ST. CLAIR COUNTY – Expect Delays

BRIDGE MAINTENANCE
Scheduled from 25-SEP-2017 to 15-OCT-2017.
Road work begins 4.38 MILES BEFORE RT A W.
Work will be done around the clock, on weekdays and Saturdays.

State Route H  – ST. CLAIR COUNTY – Expect Delays

BRIDGE MAINTENANCE
Scheduled from 21-SEP-2017 to 15-OCT-2017.
Road work begins .51 MILES BEFORE RT O W.
Work will be done around the clock, on weekdays and Saturdays.

 

Stone County

State Route 13  – STONE COUNTY – Expect Delays

ROADSIDE WORK
Scheduled from 02-OCT-2017 to 31-OCT-2017.
Road work begins .69 MILES AFTER MO 86 W.
Work will be done around the clock, on weekdays only.

State Route 265 – STONE COUNTY – Expect Delays

BRIDGE MAINTENANCE
Scheduled from 21-AUG-2017 to 20-OCT-2017.
Road work begins .91 MILES BEFORE CRD APPLE FARM RD N.
Work will be done around the clock, on weekdays and Saturdays.

State Route 86 – STONE COUNTY – Expect Delays

BRIDGE MAINTENANCE
Scheduled from 14-AUG-2017 to 20-OCT-2017.
Road work begins 2.2 MILES AFTER MO 13 S.
Work will be done around the clock, on weekdays and Saturdays.

 

Taney County

State Route 76 East – TANEY COUNTY – Road Closed

BRIDGE RECONSTRUCTION
Road closure begins 1.34 MILES AFTER MO 125 S.
Scheduled from 10-OCT-2017 to 30-MAR-2018.

Ramp BU65E TO US65N North – TANEY COUNTY – Road Closed

RESURFACING PAVEMENT
Road closure begins .06 MILES AFTER US 65 N.
Scheduled from 11-OCT-2017 to 12-OCT-2017.

Ramp US65N TO BU65E East – TANEY COUNTY – Road Closed

RESURFACING PAVEMENT
Road closure begins .02 MILES AFTER US 65 N.
Scheduled from 11-OCT-2017 to 12-OCT-2017..

US 65  – TANEY COUNTY – Expect Delays

MILLING/RESURFACING WORK
Scheduled from 17-JUL-2017 to 30-NOV-2017.
Road work begins 1.14 MILES BEFORE RT F E.
Work will be done around the clock, on weekdays only.

State Route 76 – TANEY COUNTY – Expect Delays

BRIDGE RECONSTRUCTION
Scheduled from 05-SEP-2017 to 31-OCT-2018.
Road work begins .02 MILES AFTER US 160 E.
Work will be done around the clock, on weekdays only.

State Route 76 – TANEY COUNTY – Expect Delays

MOWING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins 4.25 MILES AFTER RT FF W.
Work will be done around the clock, on weekdays only.

 

Vernon County

State Route AA  – VERNON COUNTY – Expect Delays

PAVEMENT REPAIR
Scheduled from 04-OCT-2017 to 12-OCT-2017.
Road work begins AT RT M S.
Work will be done around the clock, on weekdays only.

State Route BB – VERNON COUNTY – Expect Delays

MOWING
Scheduled from 28-SEP-2017 to 12-OCT-2017.
Road work begins AT RT W S.
Work will be done around the clock, on weekdays only.

State Route E  – VERNON COUNTY – Expect Delays

BRIDGE MAINTENANCE
Scheduled from 25-SEP-2017 to 15-OCT-2017.
Road work begins 5.52 MILES AFTER RT NN N.
Work will be done around the clock, on weekdays and Saturdays.

State Route K  – VERNON COUNTY – Expect Delays

MOWING
Scheduled from 11-OCT-2017 to 19-OCT-2017.
Road work begins AT LP 49 S.
Work will be done around the clock, on weekdays only.

State Route M  – VERNON COUNTY – Expect Delays

MOWING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins .04 MILES AFTER RT C N.
Work will be done around the clock, on weekdays only.

State Route MM  – VERNON COUNTY – Expect Delays

MOWING
Scheduled from 05-OCT-2017 to 12-OCT-2017.
Road work begins AT RT WW S.
Work will be done around the clock, on weekdays only.

State Route W  – VERNON COUNTY – Expect Delays

MOWING
Scheduled from 10-OCT-2017 to 12-OCT-2017.
Road work begins 1.98 MILES BEFORE CST ASH ST S.
Work will be done around the clock, on weekdays only.

State Route WW  – VERNON COUNTY – Expect Delays

MOWING
Scheduled from 11-OCT-2017 to 19-OCT-2017.
Road work begins AT RT D E.
Work will be done around the clock, on weekdays only.

 

Webster County

 

State Route BB  – WEBSTER COUNTY – Road Closed

BRIDGE RECONSTRUCTION
Road closure begins 3.52 MILES AFTER CST MACK RD E.
Scheduled from 14-AUG-2017 to 01-DEC-2017.

 

 

END

(For more information, call MoDOT in Springfield at 417-895-7600 or visit www.modot.org/southwest)

(Follow MoDOT’s Southwest District: Facebook | Twitter | Instagram |YouTube)

(For timely traffic information in the Springfield area, visit www.ozarkstraffic.com)